We have an old easement with an oil line 4 inches in diameter that hasn't been used for 30 years and YGI decided they want to place an 8 inch high pressure gas line right beside the oil line 12 foot beside. We have a pond that's a third of an acre there going under 14 acres of Woodland there chiseling the whole side off and down through a mile of farmland. They came around in February and said it would be a minimum of disturbance two small lines side-by-side what's the big deal they have to remove 60-foot Wide Pass, remove all the topsoil 1ft subsoil. Compact the subsoil below can create basically a Highway across the whole Farm 60 foot wide then they dig a ditch 18 inches wide 5 foot deep and place the pipeline in. Contractor went through the Woodland show a little mercy on me only took 45 foot because he said the trees were pretty nice. UGI came back in and said cut them down they won't give an inch. The trees are mine and they know it the ground most of them up they brought a huge grinder and because they need the wood chips to control erosion. He said they do not have to pay for the trees I told him that is another crop we Harvest you have to pay for any crop damage you do. We got a new lawyer. The people that bid the job or from Texas and Kentucky. The event the equipment from a local dealer.

Attached Thumbnails

  • 20161027_073032.jpg
  • 20161027_081107.jpg
  • 20161027_133934(0).jpg
  • 20161027_105353.jpg
  • 20161027_073053.jpg


Pipeline

0 commentaires:

Enregistrer un commentaire